    CT-TG Baja California II Phase 1

    The plant will cover peak and emergency demand in the State of Baja California.

    ACCIONA Industrial carried out the design, supply, construction and start-up of a 135 MW electricity generation plant consisting of three Gas Natural General Electric turbo-generators, including a substation line and bay of 115KV with auxiliary connections. The project completion period is 19 months. The total sum of the contract with the Federal Electricity Commission is $103 million US. The LM6000 aeroderivative turbines were designed for the aeronautical industry, this being an application for the electric power sector. 

    Image Gallery

    discover other flagship projects

    CCI Baja California Sur III

    Baja California, Mexico

    ACCIONA Industrial carried out the design, supply, construction and start-up of a 42 MW electricity generation plant of combined capacity

    San Rafael hydroelectric plant

    San Rafael, Mexico

    Design, engineering, construction, supply of equipment, assembly and start-up of the Hydroelectric plant and the Substation and High Voltage Line