- ACCIONA
- Business divisions
- Energy
- Emblematic projects
- “Nevada Solar One” solar thermal/CSP plant
True to its philosophy of being pioneers in development and sustainability, when ACCIONA connected Nevada Solar One (NSO) plant in the Nevada desert to the grid, it was the first to be installed in the world in 19 years, after the units installed in the Mojave Desert in the early 90s, at the height of the oil crisis. The NSO was the poster child for the emergence of a technology destined to play a significant role in the U.S. energy system and in large parts of the world with enough solar capacity.
Nevada Solar One has made ACCIONA a world leader in CSP. The plant's construction and operation, with production 9% higher than forecast in the first year of operation, has been a key experience in order to undertake new projects in this technology.
Based on this experience, the company was able to deploy five solar plants totaling 250 MW in a matter five years (2008-2012).
A reversible hydro plant with a capacity of 88.85 MW located in the heart of the Pyrenees in Aragon.
View ACCIONA Social Networks